Revolutionizing Framing

New Tech, New Techniques

Building America's Future 4X Faster with 99% Less Job Site Waste

The Only AI-Powered Construction Solution
That Transforms Months Into Weeks
While Delivering Superior Quality Every Time

0X
Times Faster Construction
0X
Better Quality
0%
Less Job Site Waste

The Crisis Is Real

The FrameTec Solution

$160 Billion+ in Lost Value

Material overages, cutting mistakes, and site inefficiencies cost developers and contractors over $160 billion annually — not including time lost to delays and rework.

AI-Powered Manufacturing

Our proprietary AI + robotics platform creates precisely pre-cut, ready-to-assemble framing systems in a climate-controlled facility — no guesswork, no weather delays, no on-site measuring errors.

600 Million Tons of Construction Waste

The U.S. construction industry produces over 600 million tons of waste every year, more than double the total municipal waste. This leads to skyrocketing landfill costs, environmental strain, and wasted resources.

99% Job Site Waste Reduction

With advanced material optimization algorithms, FrameTec reduces framing waste to less than 1% — eliminating dumpsters, cleanup crews, and costly overruns.

Project Delays Are the Norm

Traditional framing takes 6–10 weeks on average — often longer with weather, scheduling, or material issues. Delays cost developers millions in interest, missed rental income, and reputation.

4x Faster Framing Delivery

What takes 6–10 weeks with traditional framing, FrameTec delivers in 10–14 business days — from design to delivery, ready for assembly. That’s up to 75% faster framing and weeks of time savings.

Severe Labor Shortage – 430,000+ Jobs Unfilled

As of this year, the construction industry faces a nationwide shortfall of 430,000 skilled workers, leading to project delays, cost overruns, and safety issues.

Reliable Labor Free Install

No more relying on unpredictable labor markets. Our pre-cut frames can be assembled by 2–4 general workers, no special tools or experience required — saving you thousands per project.

The Crisis Is Real

$160 Billion+ in Lost Value

Material overages, cutting mistakes, and site inefficiencies cost developers and contractors over $160 billion annually — not including time lost to delays and rework.

The FrameTec Solution

AI-Powered Manufacturing

Our proprietary AI + robotics platform creates precisely pre-cut, ready-to-assemble framing systems in a climate-controlled facility — no guesswork, no weather delays, no on-site measuring errors.

The Crisis Is Real

600 Million Tons of Construction Waste

The U.S. construction industry produces over 600 million tons of waste every year, more than double the total municipal waste. This leads to skyrocketing landfill costs, environmental strain, and wasted resources.

The FrameTec Solution

99% Waste Reduction

With advanced material optimization algorithms, FrameTec reduces framing waste to less than 1% — eliminating dumpsters, cleanup crews, and costly overruns.

The Crisis Is Real

Project Delays Are the Norm

Traditional framing takes 6–10 weeks on average — often longer with weather, scheduling, or material issues. Delays cost developers millions in interest, missed rental income, and reputation.

The FrameTec Solution

4x Faster Framing Delivery

What takes 6–10 weeks with traditional framing, FrameTec delivers in 10–14 business days — from design to delivery, ready for assembly. That’s up to 75% faster framing and weeks of time savings.

The Crisis Is Real

Severe Labor Shortage – 430,000+ Jobs Unfilled

As of this year, the construction industry faces a nationwide shortfall of 430,000 skilled workers, leading to project delays, cost overruns, and safety issues.

The FrameTec Solution

Reliable Labor Free Install

No more relying on unpredictable labor markets. Our pre-cut frames can be assembled by 2–4 general workers, no special tools or experience required — saving you thousands per project.

Meet OUR CEO & CO-FOUNDER

Welcome to FrameTec

Watch our CEO explain how you can help solve the housing crisis—while earning up to 13% fixed annual returns

Revolutionizing the construction industry with our patented manufacturing process.

  • $100+ Million Raised to Date

  • 4X Faster Than Traditional Framing

  • <1% Material Waste

  • Patented Automation System

  • Backed by Veteran Builders & Investors

before frametec™

The "Old" Process

Inefficiencies lead to a lot of waste of time, money, and resources. FrameTec aims to solve for these inadequacies at scale.

12+ month process

Inefficient and ineffective processes lead to long, drawn out building process that is a waste of a lot of resources.

12-20% wasted materials

Materials would be dropped off on site, then measured and cut, leading to large amounts of waste.

Unreliable framing crews

Poorly trained or poorly managed framing crews can cause delays or inferior builds.

DISRUPTING THE INDUSTRY

The FrameTec Way™

FrameTec is a pioneering manufacturing plant and framing services provider disrupting the construction industry. Our state-of-the-art facilities employ human-in-the-loop automation to expertly manufacture roof trusses, floor trusses, and exterior and interior wall panels.

In as little as 2 weeks

Incredibly efficient build process saves money and time!

Near zero waste

The exact amount of wood is measured, cut, then manufactured off-site then delivered leading to near zero waste.

The FrameTec team

A highly trained, dedicated, reliable team yields amazing results.

From Blueprints to job site in record time

How The FrameTec Way™ Works

Revolutionary 4-step process that transforms traditional construction

1

Your plans uploaded

Send us your architectural plans digitally - any format, any size project

2

AI-optimized cut system

Our AI analyzes and optimizes every cut and assembly for maximum efficiency

3

Factory-built panels

Robotic manufacturing creates precision panels in our controlled environment

4

Fast installation on-site

Rapid installation of pre-built panels - weeks instead of months

The Time & Cost Revolution

See how FrameTec transforms construction timelines and costs

Project Timeline Comparison

Weeks
20
Traditional Construction
5
FrameTec Process
Traditional: 5 month framing process
FrameTec: 5 weeks framing process

Cost Impact Analysis

85%
Savings
Labor Costs: 60% reduction
Job Site Material Waste: 99% elimination
Project Delays: 85% reduction

Environmental Revolution

FrameTec doesn't just build faster - we're building a sustainable future

99%
Job Site Waste Reduction
Traditional construction generates 40% waste. FrameTec reduces this to less than 1%.
75%
Carbon Footprint Reduction
Precise manufacturing and reduced transport significantly lower environmental impact.
500K+
Tons of Waste Prevented
Our technology has already prevented over 500,000 tons of construction waste.

Transforming a $1.2 Trillion Market

FrameTec is positioned to capture significant market share in the massive U.S. construction industry

$0.0T
U.S. Construction Market
0.0M
Housing Units Needed
0K
Unfilled Jobs
0M
Tons Waste/Year

Choose Your Path to Success

Whether you're looking to invest in the future of construction or revolutionize your building process, FrameTec has the solution for you

INVESTORS

Join visionary investors backing the technology that's solving America's $1.2 trillion housing crisis

  • $103M+ in projected revenue pipeline

  • Dozens of projects in development

  • Patented AI-driven manufacturing technology

  • Nationwide expansion plan

BUILDERS

Transform your construction process with revolutionary framing technology that delivers results

  • Reduce framing time from months to weeks

  • Eliminate 99% of job site waste

  • Superior quality with precision manufacturing

  • Significant cost savings & faster ROI

For Investors

A Rare Opportunity to Shape the Future of Construction

  • Solve a $100B+ market problem

  • Patented & scalable technology

  • ESG-ready, vertically integrated

  • Short window to invest pre-launch

Investor Testimonials

"Revolutionizing the construction industry"

"FrameTec is revolutionizing the construction industry with its state-of-the-art facility and innovative approach."

- Jamie Kerr

"Embodies everything Camp Verde"

"FrameTec embodies everything Camp Verde and the greater Verde Valley values: good-paying jobs, innovative management and companies that believe in the concept of community partnership."

- Dee Jenkins

"Perfect partners"

"Habitat for Humanity of Northern Arizona’s Starter Home model and FrameTec’s framing system are perfect partners as we disrupt both the affordable and workforce housing sectors."

- Eric Wolverton

For Builders

You Build. We Deliver – Faster, Smarter, More Efficient.

  • 75% Faster Framing Times: From 12+ Months to as little as 2 weeks

  • From 12-20% wasted materials to up to 99% Job Site Waste Reduction

  • Panelized Wall Systems Assembled Off-Site

  • From Unreliable framing crews to FrameTec certified fast framing crew on site

  • One-Stop Shop with Seamless Logistics

  • Zero Rework. Total Reliability.

Builder Testimonials

"Thrilled to partner"

"We're thrilled to partner with FrameTec to bring a new era of homebuilding to life."

- Dave Everson

"Hard to outperform"

"This project is and has been one of the smoothest projects I have been a part of in my 35 years as a builder. FrameTec will be hard to outperform."

- Dave Helmericks

"Reliable, tidy, and communicative"

"In a fast-paced, detail-driven environment like LivAway Suites, having a framing partner who is reliable, tidy, and communicative is invaluable."

- Scott Reed

Builders, Investors, and Partners
Are Raving About FrameTec

See how FrameTec transformed these businesses

Community Voices

Jamie Kerr

Economic Development Administrator,
Town of Prescott Valley, AZ

"FrameTec is revolutionizing the construction industry with its state‑of‑the‑art facility and innovative approach. Their use of automation delivers precise, high‑quality roof trusses and wall panels, streamlining projects while reducing waste—truly a game‑changer for our communities and the State of Arizona."

Dee Jenkins

Former Mayor, Town of Camp Verde, AZ

"I am delighted in FrameTec’s decision to locate their first U.S. manufacturing facility and corporate headquarters in Camp Verde… FrameTec embodies everything Camp Verde and the greater Verde Valley values: good‑paying jobs, innovative management and companies that believe in community partnership."

Featured Trade Partner

Tessa Lau

Founder & CEO

"Working with FrameTec is a perfect example of the kind of partnership we love. Their commitment to precision, innovation, and continuous improvement mirrors our own values at Dusty. From day one, the FrameTec team has been curious, collaborative, and relentlessly focused on building better. They’re not just adopting technology—they’re transforming their process to take full advantage of it. Together, we’ve shortened layout time, eliminated rework, and created a seamless flow from BIM to field. It’s been inspiring to support their journey and watch them build not just houses, but a faster, smarter way to construct the future."

Additional Partners

Randek

Simpson Strong Tie

Eagle Metal

Meet the Families We're Helping

"Thanks to FrameTec's efficiency, we moved into our dream home 6 months ahead of schedule."

- Sarah & Mike Johnson, Phoenix, AZ

For Sustainability

Near Zero Waste. Zero Guesswork. 100% Smarter.

Transforming more than an industry...

  • Lumber optimized with patented finger-joining

  • No dumpsters full of waste

  • Major reduction in carbon, diesel, and delays

0%
Job Site Waste Reduction
0%
Energy Savings
0%
Carbon Reduction
0%
Material Optimization

Maximizing manufacturing efficiency

Our Vision at FrameTec

Filling The Demand For Housing

FrameTec is committed to creating sustainable housing solutions while fostering local job growth. With a capacity of 3,000+ homes per year per plant, our facilities are strategically located in high-demand housing markets, and we collaborate with local governments to deliver affordable housing solutions to communities in need.

Reducing Time, Cost, & Materials

Our process significantly reduces construction time, cost, and materials waste, making it an ideal solution for developers and builders. Our unique framing process assembles our products directly on the job site, resulting in a fully framed building shell including roof and trusses plus interior walls.

Solving Supply Chain Issues

Our state-of-the-art facilities and unique framing process eliminate many of the supply chain issues that currently plague the construction industry. By manufacturing in a controlled environment, we reduce the need for transportation and minimize the risk of damage to materials.

Creating Jobs in the USA

At FrameTec, we pride ourselves on being community-oriented, and our mission is to create sustainable housing solutions while also fostering local job growth. Our facilities are located in the USA, and we are committed to creating jobs in the communities we serve.

Let’s Build the Future – Together

HISTORY

Timeline

2021:

Due Diligence

Completing due diligence is a crucial step in any business transaction or investment process. It involves conducting a comprehensive and systematic investigation to assess the various facets of a company, project, or opportunity. This process typically entails examining financial records, legal documents, operational procedures, and potential risks associated with the venture.

2022:

Alpha site selected

Site selected for first location in Camp Verde, Arizona (Alpha) . The process involved choosing the site, permitting, and groundwork such as excavation, laying, and infrastructure development.

2023:
Plant #2 (Bravo)

Location acquired in Casa Grande, Arizona. Site planning begins for second FrameTec location.

2024:
AZ - Alpha goes LIVE

First FrameTec Plan goes live in Arizona. Q4

2025:

Texas planning, Bravo in development

The FrameTec™ Team is currently looking at growth opportunities across the United States. New site announcements coming soon.

Tell Us How You'd Like to Get Involved

You’ll get a brief introduction tailored to your interest — no fluff, just clarity.

Transforming American construction through speed, innovation, and sustainability.

Important Legal Disclosures

Investment Risk

All investments carry risk of loss. Past performance does not guarantee future results. The value of investments may fluctuate and investors may lose some or all of their investment.

Accredited Investors Only

This investment opportunity is limited to accredited investors as defined under Rule 501 of Regulation D of the Securities Act of 1933.

Forward-Looking Statements

All projections, estimates, and forward-looking statements are based on current expectations and are not guarantees of future performance.

SEC Compliance

Securities offered through [Broker-Dealer Name], Member FINRA/SIPC. FrameTec and [Broker-Dealer Name] are separate entities.

Professional Advice

Before making any investment decision, prospective investors should consult with their financial advisor, tax advisor, and legal counsel.

Anti-Money Laundering Compliance

FrameTec maintains strict AML/KYC procedures in accordance with federal regulations and industry best practices.

Copyrights 2025 | FrameTec™ | AZ ROC #351182 | Privacy Policy | Terms & Conditions